Available Sizes: 10 fl. oz., 28 fl. oz.
Color When Dry: Off-white
Where to Buy
Loctite® PL 200® Projects Construction Adhesive
Safety Precautions
Interior applications require ventilation to the outside during application and cure. Wear gloves. Wash hands after use.
Preparation
The temperature of the product, the surfaces and the working area must be above 40°F (4°C) and below 100°F (38°C). For best performance, apply adhesive at 70°F (21°C). Ensure surfaces to be bonded are clean, dry, structurally sound and free of dust, grease, oil, and other foreign contaminants. Precut and fit materials before applying adhesive. Cut off tip of cartridge in an 'X' cutting method, cutting both sides of the nozzle. Puncture inside seal of cartridge.
Application
Using a caulking gun, apply a continuous bead of adhesive to all furring strips, studs and top and bottom plates. Position pre-fitted panels. Follow the nailing schedule for adhesives nail-on attachment per the Gypsum Association Manual. If installing panels to drywall, apply adhesive in a zigzag pattern within 1 inch of vertical edges on each side and two vertical beads in the panel center, 16 inches apart. Use mechanical fasteners at top and bottom to hold panel in place. Warped or bowed panels should not be used.
Cleanup
Clean tools and uncured adhesive residue immediately with warm water and soap. Cured adhesive may be carefully cut away with a sharp edged tool.